Asbestos AIB ceilings, walls & partitions
From one board to a full ceiling, wall lining or partition.
ASBESTOS AIB REMOVAL IN LONDON
Need asbestos AIB removal in London before building work can continue? We can discuss asbestos insulating board in ceilings, walls, cupboards, doorways and service areas. If you have a survey result, send the relevant page. If the board is only suspected, call with the postcode and what your builder needs to do next.
CALL OR SEND US A MESSAGE
Call us and tell us what you need removed. You do not need to have every detail ready. If you cannot call, fill in the form and we will get back to you about the work.
For refurbishment involving managed-building access, see asbestos AIB removal in Battersea. For internal panels, shared doorways and handover to the next trade, see asbestos AIB removal in Tooting. Both pages explain how to enquire with a confirmed result or suspected material.
ASBESTOS AIB REMOVAL FOR DIFFERENT TYPES OF PROPERTY
It might be one AIB panel around a fireplace, boards inside a cupboard or fire door, or a ceiling or wall in a home you are renovating.
It could also be AIB in a rented property, shop, office, school or larger building. We can deal with one small area or plan a larger job around tenants, staff, builders and other trades.
You do not need to explain it in technical words. Call us, tell us what has been found and what work you are planning. We will explain how we can help.
Call 020 8088 0271 about your asbestos AIB job →

ASBESTOS AIB REMOVAL WORK
If your job is not listed, call us anyway. These are simply some of the AIB jobs people ask us to deal with.
From one board to a full ceiling, wall lining or partition.
Asbestos AIB boards around pipes, cables, ducts and boxed-in services.
AIB inside cupboards, behind or around meters, electrical equipment and service panels. Tell us if an electrician or refurbishment team is waiting for the board to be removed.
AIB around fireplaces, inside or around fire doors, above door openings, in boiler cupboards and other areas where fire-resistant board was fitted.
Asbestos AIB soffit boards that need removing before new roofline work. See our dedicated asbestos AIB soffit removal page →
Asbestos AIB that needs to come out before rewiring, demolition or other work.
WHEN AIB IS HOLDING UP OTHER WORK
AIB is in a ceiling, partition, riser or service area that must be cleared before rewiring, strip-out, new ceilings or other refurbishment work.
Tell us who is using the building, which rooms or routes must stay available and whether builders or other trades are booked for a fixed date.
One AIB panel around a fireplace, cupboard or door can still affect access, controls, removal method and when the next trade can start.
ASBESTOS AIB WORK AND LICENSING
Most asbestos AIB removal needs a licensed contractor. Limited tasks may fall outside licensing when the assessed work meets the relevant conditions; size alone does not decide it. It depends on what must come out, the condition of the board and how the work will affect it.
You do not need to work through the rules yourself. Call us, explain the job and we will tell you what is needed.


GETTING A QUOTE
Tell us where the AIB is — for example a ceiling, wall, riser, cupboard, fire door, fireplace or boiler area — and roughly how much needs to come out.
Include the property type, access, whether people are still using the building and whether builders or other trades are waiting to start.
If you already have an asbestos report, drawing or sample result, send the relevant part. Photos also help. You can still contact us without paperwork.
Call 020 8088 0271 for a quote →WHAT THE QUOTE SHOULD MAKE CLEAR
Asbestos AIB work varies from one panel to a larger controlled enclosure. Before work starts, the scope should explain the boards being removed, the controls needed and any checks required before the room or work area is handed back.
Confirm the ceiling, wall, riser, cupboard, fire door or other AIB included in the quote.
Tell us who is using nearby rooms and whether builders or other trades are waiting to return.
Where independent inspection, air testing or formal clearance is required, it should be allowed for in the plan.
Tell us what needs fitting or repairing after the AIB is removed so the handover point is clear.
ASBESTOS AIB REMOVAL FAQ
Most asbestos AIB removal is licensable. Some limited tasks can fall outside licensing, but this depends on the assessed work and the relevant conditions, not just whether the board looks small.
Tell us what the survey says, where the board is and what needs removing. You do not need to decide the category before contacting us. Our licensed asbestos removal information explains the wider service; the actual job determines the controls and planning requirements.
Send the relevant report pages, the postcode and a short description of the work you need completed. A survey may identify several items, while your immediate refurbishment affects only part of the property, so tell us which areas the builder needs released.
Approximate quantities, safe photos and access details can help when available. You do not need to assemble a full tender pack. We will discuss any gaps that matter to the asbestos AIB removal quote and whether a site visit is needed.
Yes. A single panel, doorway section or service cupboard can be discussed as a defined scope. Its condition, fixings, location and the people or equipment nearby all affect assessment; small size does not automatically mean a simple or non-licensed job.
For a doorway or occupied-property enquiry, the asbestos AIB removal page for Tooting explains the access questions. Describe the board in place rather than disturbing it to make the enquiry easier.
No. Asbestos insulating board, usually shortened to AIB, and asbestos cement are different materials. They can require different controls, so an old board should not be assigned to either category from appearance alone.
If a report identifies the product, send its wording. If it is only suspected, explain the planned work and we can discuss asbestos surveys or sampling to establish the relevant facts. Confirmation can be needed before the removal scope is finalised without being a barrier to first contact.
The extent and condition of the board, fixings, working height, access, required controls and surrounding occupancy all affect the quote. Two areas of the same size may involve different arrangements when one is reached directly and the other through managed common parts.
For example, our asbestos AIB removal page for Battersea explains shared access and building-management questions. Tell us which trade follows the asbestos work so exclusions and the required handover are clear before the price is agreed.
The asbestos work, cleaning and applicable checks must be completed before the affected area is handed back. For work requiring formal clearance, the inspection and testing arrangements form part of planning; not every job has identical documentation.
Agree what will be removed, which areas are excluded and what evidence of completion will be supplied. Builders should not return on the assumption that removing the visible boards is the whole task. Tell us about rewiring, demolition or replacement work that depends on the handover.
Yes. Call 020 8088 0271 or use the enquiry form with the postcode and a short description of the problem. Say whether asbestos AIB has been confirmed or the board is only suspected.
Reports, photographs and approximate measurements are helpful if you already have them, but they are not a checklist you must complete before contacting us. We can discuss the next assessment step and the details needed for a useful quotation.
Stop work that could disturb it further and keep people away from the affected area while advice is obtained. Tell us what was uncovered, whether damage or debris is present and which part of the renovation has stopped.
Do not try to remove a piece just to identify it for the enquiry. If other people, tenants or trades use the building, mention that too. We can discuss the assessment and asbestos AIB removal enquiry without assuming the whole refurbishment must be stripped out.